Water Code § 27.0513: AREA PERMITS AND PRODUCTION AREAS FOR URANIUM MINING
1 bill in the 90th Legislature would change this section
- HB 302 amends this section
Part of Water Code Chapter 27, with every bill that changes it.
Bills are matched to sections automatically from their text and can be missed, for example when a bill changes a whole chapter at once or renumbers sections. No bill listed here does not mean no bill changes this section.
Current law
Sec. 27.0513. AREA PERMITS AND PRODUCTION AREAS FOR URANIUM MINING. (a) The commission may issue a permit pursuant to Section 27.011 that authorizes the construction and operation of two or more similar injection wells within a specified area for mining of uranium. An application for a new permit issued pursuant to Section 27.011, a major amendment of such a permit, or a renewal of such a permit for mining of uranium is subject to the public notice requirements and opportunity for contested case hearing provided under Section 27.018. A new, amended, or renewed permit must incorporate a table of pre-mining low and high values representing the range of groundwater quality within the permit boundary and area of review, as provided by commission rule, for each water quality parameter used to measure groundwater restoration in a commission-required restoration table. The values in the permit range table must be established from pre-mining baseline wells and all available wells within the area of review, including those in the existing or proposed permit boundary and any existing or proposed production areas. Wells used for that purpose are limited to those that have documented completion depths and screened intervals that correspond to a uranium production zone aquifer identified within the permit boundary.
(b) For a permit for mining of uranium issued on or after September 1, 2007, pursuant to Section 27.011, the term of the permit to authorize injection for recovery of uranium shall be 10 years. The holder of a permit for mining of uranium issued by the commission before September 1, 2007, pursuant to Section 27.011, must submit an application to the commission before September 1, 2012, for renewal of the permit to authorize construction and operation of injection wells for mining of uranium. Authority to construct or operate injection wells for recovery of uranium under a permit issued before September 1, 2007, pursuant to Section 27.011, expires on September 1, 2012, if an application for renewal of the permit is not submitted to the commission before September 1, 2012. Expiration of authority under this subsection does not relieve the permit holder from obligations under the permit or applicable rules, including obligations to restore groundwater and to plug and abandon wells in accordance with the requirements of the permit and applicable rules.
(c) The commission may issue a holder of a permit issued pursuant to Section 27.011 for mining of uranium an authorization that allows the permit holder to conduct mining and restoration activities in production zones within the boundary established in the permit. The commission by rule shall establish application requirements, technical requirements, including the methods for determining restoration table values, and procedural requirements for any authorization. If a restoration table value for a proposed or amended authorization exceeds the range listed in the permit range table such that it falls a
The section continues: whole chapter.
Links
- This chapter as it stands now, Markdown copy of the Texas Legislative Council's statute files
- Official text on statutes.capitol.texas.gov
- RSS feed of actions on these bills
Texas Bill Atlas is an independent research tool, not an official state website.