HB 302: Relating to procedural requirements for uranium mining area permits and associated production area authorizations.
- Session
- 90th Texas Legislature, Regular Session
- Status
- Filed
- Filed
- Nov 9, 2026
- Most recent action
- 11/09/2026 H Filed
- Authors
- Guillen
- Official subjects
- Environment--Hazardous, Toxic & Nuclear Waste; Environment--Water; Mines & Mineral Resources; PERMITS; ENVIRONMENTAL QUALITY, TEXAS COMMISSION ON
AI summary (not official): Changes notice, hearing, and groundwater-restoration rules for uranium mining permits.
Topics: Business regulation, Environment & water. From AI review or caption rules.
Agencies it could affect (possible, not confirmed): Texas Commission on Environmental Quality. From AI review or caption rules.
Laws this bill changes
- amends Water Code § 27.0513
Bill text (Introduced)
By: Guillen H.B. No. 302
A BILL TO BE ENTITLED
AN ACT
relating to procedural requirements for uranium mining area permits and associated production area authorizations.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
SECTION 1.
Section 27.0513, Water Code, is amended to read as follows:
Sec. 27.0513. AREA PERMITS AND PRODUCTION AREAS FOR URANIUM MINING. (a) The commission may issue an area [a] permit pursuant to Section 27.011 that authorizes the construction and operation of two or more similar injection wells within a specified area for mining of uranium.
(a-1) An application for a new area permit issued pursuant to Section 27.011, a major amendment of such a permit, or a renewal of such a permit for mining of uranium is subject to the public notice requirements and opportunity for contested case hearing provided under Section 27.018. Not later than the 30th day after the date the commission determines the application for an area permit to be administratively complete, the commission shall mail notice of receipt of the application to:
(1) the owners of the surface of:
(A) the tract of land on which the existing or proposed permitted area is or will be located; and
(B) the tracts of land adjacent to the land described by Paragraph (A); and
(2) the owners of mineral rights underlying:
(A) the tract of land on which the existing or proposed permitted area is or will be located;
(B) the tracts of land adjacent to the land described by Paragraph (A); and
(C) the territory of any groundwater conservation district established in the county in which the existing or proposed permitted area is or will be located.
(a-2) A new, amended, or renewed area permit must incorporate a table of pre-mining low and high values representing the range of groundwater quality within the permit boundary and area of review, or other values acceptable to the commission,as provided by commission rule, for each water quality parameter used to measure groundwater restoration in a commission-required restoration table. The initial values in the permit range table must be established from pre-mining baseline wells and all available wells within the area of review, including those in the existing or proposed permit boundary and any existing or proposed production areas. Wells used for that purpose are limited to those that have documented completion depths and screened intervals that correspond to a uranium production zone aquifer identified within the permit boundary.
(b) For an area [a] permit for mining of uranium issued on or after September 1, 2007, pursuant to Section 27.011, the term of the permit to authorize injection for recovery of uranium shall be 10 years. [The holder of a permit for mining of uranium issued by the commission before September 1, 2007, pursuant to Section 27.011, must submit an application to the commission before September 1, 2012, for renewal of the permit to authorize construction and operation of injection wells for mining of uranium.] Authority to construct or operate injection wells for recovery of uranium under a permit issued before September 1, 2007, pursuant to Section 27.011, expires on September 1, 2012, if an application for renewal of the permit is not submitted to the commission before September 1, 2012. Expiration of authority under this subsection does not relieve the permit holder from obligations under the permit or applicable rules, including obligations to restore groundwater and to plug and abandon wells in accordance with the requirements of the permit and applicable rules.
The text continues: full text of HB 302.
Links
- Full bill text (Introduced), Markdown copy of the official file