# SB 435 - Introduced

90R1028 SCR-F

By: Hall S.B. No. 435

A BILL TO BE ENTITLED

AN ACT

relating to the permitting of renewable energy generation facilities; authorizing fees.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

### SECTION 1.

Subchapter C, Chapter 15, Utilities Code, is amended by adding Section 15.053 to read as follows:

<ins>Sec. 15.053. COMPLAINT REGARDING RENEWABLE ENERGY GENERATION FACILITIES. (a) An affected person may complain to the commission in writing setting forth an act or omission by an owner or operator of a renewable energy generation facility in violation or claimed violation of Subchapter F, Chapter 35.</ins>

<ins>(b) The commission shall keep for a reasonable period an information file about each complaint filed with the commission relating to an owner or operator of a renewable energy generation facility.</ins>

<ins>(c) The commission, at least quarterly and until final disposition of the written complaint, shall notify the parties to the complaint of the status of the complaint unless the notice would jeopardize an undercover investigation.</ins>

### SECTION 2.

Chapter 35, Utilities Code, is amended by adding Subchapter F to read as follows: <ins>SUBCHAPTER F. RENEWABLE ENERGY GENERATION FACILITY PERMIT</ins>

<ins>Sec. 35.201. DEFINITIONS; APPLICABILITY. (a) In this subchapter:</ins>

<ins>(1) "Permit holder" means a person who holds a permit issued under this subchapter.</ins>

<ins>(2) "Person" includes an electric cooperative and a municipally owned utility.</ins>

<ins>(3) "Renewable energy generation facility" means:</ins>

<ins>(A) a wind power facility as defined by Section 301.0001;</ins>

<ins>(B) a solar power facility as defined by Section 302.0001;</ins>

<ins>(C) a battery energy storage facility as defined by Section 303.0001 or another type of electric energy storage facility; or</ins>

<ins>(D) a renewable power facility.</ins>

<ins>(4) "Renewable power facility" means a facility that:</ins>

<ins>(A) generates electric energy using a renewable energy technology, as defined by Section 39.916, other than a technology that relies exclusively on wind or solar energy; and</ins>

<ins>(B) is not an electric energy storage facility.</ins>

<ins>(b) The permit requirements of this subchapter apply to a renewable energy generation facility regardless of whether the facility is the subject of a facility agreement entered into under Chapter 301, 302, or 303.</ins>

<ins>(c) This subchapter applies only to a renewable energy generation facility that is intended to be used to sell energy or ancillary services at wholesale.</ins>

<ins>Sec. 35.202. PERMIT REQUIRED. (a) A person may not interconnect a renewable energy generation facility to a transmission facility unless the person holds a permit to operate a renewable energy generation facility issued by the commission under this subchapter.</ins>

<ins>(b) The commission by rule shall require each permitted renewable energy generation facility to be installed only in a location that:</ins>

<ins>(1) for a solar power facility, is at least:</ins>

<ins>(A) 500 feet from any property line, unless the permit holder has obtained a written waiver from each owner of property located less than 500 feet from the permitted facility; and</ins>

<ins>(B) 500 feet from any habitable structure, unless the permit holder has obtained a written waiver from each owner of the habitable structure;</ins>

<ins>(2) for a wind power facility, is at least twice the height of the wind turbine, including the blades of the turbine, from the property line of each property that borders the property on which the permitted facility is located, unless the permit holder has obtained a written waiver from each owner of property located in the applicable area; and</ins>

<ins>(3) for a battery energy storage facility, is at least:</ins>

<ins>(A) 500 feet from any property line, unless the permit holder has obtained a written waiver from each owner of property located less than 500 feet from the permitted facility; and</ins>

<ins>(B) 500 feet from:</ins>

<ins>(i) public ways;</ins>

<ins>(ii) buildings;</ins>

<ins>(iii) stored combustible materials;</ins>

<ins>(iv) hazardous materials;</ins>

<ins>(v) high-piled stock; and</ins>

<ins>(vi) other exposure hazards not associated with electrical grid infrastructure.</ins>

<ins>(c) The commission by rule shall require:</ins>

<ins>(1) each permitted renewable energy generation facility to be installed only in a location that, in the event of an emergency at the site of the permitted renewable energy generation facility, will not block the only access point to a residential area; or</ins>

<ins>(2) an alternate access point to be constructed for any residential area in which an emergency at the site of the permitted facility could block the only access point to the residential area.</ins>

<ins>(d) A person may apply for a permit under this subchapter by filing with the commission:</ins>

<ins>(1) a description of the proposed location of the renewable energy generation facility;</ins>

<ins>(2) a description of the type of renewable energy generation facility;</ins>

<ins>(3) a statement identifying the fire department, as defined by Section 419.021, Government Code, volunteer fire department, fire marshal, or other first responder entity that may reasonably be expected to be the primary first responder to a fire at the location of the renewable energy generation facility;</ins>

<ins>(4) a statement that the person has provided written notice to the entity identified in Subdivision (3) of the applicant's intent to install a renewable energy generation facility;</ins>

<ins>(5) evidence of insurance coverage sufficient to insure against losses arising from the operation of the renewable energy generation facility; and</ins>

<ins>(6) any other information required by commission rule.</ins>

<ins>(e) When an application for a permit, or an amendment to a permit issued under this section, is filed, the commission shall give notice of the application to the county judge of the county in which all or a majority of the renewable energy generation facility is proposed to be located. The county shall publish the notice in at least three consecutive issues of a newspaper with general circulation in the county. The county shall also publish the notice on the county's Internet website. The county may not remove the notice from its Internet website after publication.</ins>

<ins>(f) The commission may hold one or more public meetings on a permit application in the county in which the renewable energy generation facility is proposed to be located. The commission shall hold a public meeting:</ins>

<ins>(1) on the request of a member of the legislature who represents the area in which the renewable energy generation facility is proposed to be located; or</ins>

<ins>(2) if the commission determines there is substantial public interest in the proposed permit.</ins>

<ins>(g) The commission by order or rule may delegate to the executive director or another commission employee the authority to hold a public meeting under this section.</ins>

<ins>(h) The commission may approve an application for a permit only if the commission finds that:</ins>

<ins>(1) issuance of the permit would not violate state or federal law; and</ins>

<ins>(2) the location of the proposed renewable energy generation facility complies with rules adopted under Subsections (b) and (c).</ins>

<ins>(i) The commission by rule shall adopt a fee to be imposed on each permit applicant to cover costs associated with implementing this section.</ins>

<ins>(j) For purposes of this subchapter:</ins>

<ins>(1) a provision of Subchapter B or E, Chapter 14, that authorizes the commission to regulate a public utility also applies to a person required to obtain a permit under this section, including an electric cooperative or a municipally owned utility; and</ins>

<ins>(2) a reference in Chapter 15 to a person includes a person required to obtain a permit under this section, including an electric cooperative or a municipally owned utility.</ins>

### SECTION 3.

As soon as practicable after the effective date of this Act, the Public Utility Commission of Texas shall adopt rules to effectuate the changes in law made by this Act.

### SECTION 4.

This Act takes effect immediately if it receives a vote of two-thirds of all the members elected to each house, as provided by Section 39, Article III, Texas Constitution. If this Act does not receive the vote necessary for immediate effect, this Act takes effect September 1, 2027.