# HB 949 - Introduced

90R2203 LRM-F

By: Dean H.B. No. 949

A BILL TO BE ENTITLED

AN ACT

relating to requirements and preferences for purchasing construction materials produced in the United States and this state.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

### SECTION 1.

Chapter 2252, Government Code, is amended by adding Subchapter H to read as follows: <ins>SUBCHAPTER H. REQUIREMENTS AND PREFERENCES FOR DOMESTIC CONSTRUCTION MATERIALS</ins>

<ins>Sec. 2252.231. DEFINITIONS. In this subchapter:</ins>

<ins>(1) "Construction materials" means, if permanently incorporated into a public infrastructure project, iron, steel, manufactured products, concrete, cement, aggregates, glass, lumber, drywall, copper, aluminum, asphalt, plastics, and fiber-optic cable.</ins>

<ins>(2) "Political subdivision" includes a county, a municipality, a municipal utility district, a water control and improvement district, a special utility district, and other types of water districts.</ins>

<ins>(3) "Procuring entity" means a:</ins>

<ins>(A) state agency; or</ins>

<ins>(B) political subdivision.</ins>

<ins>(4) "Produced in the United States" means:</ins>

<ins>(A) with respect to iron and steel, all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;</ins>

<ins>(B) with respect to a manufactured product:</ins>

<ins>(i) the product was manufactured in the United States; and</ins>

<ins>(ii) the cost of the product's components that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all the product's components; and</ins>

<ins>(C) with respect to a construction material other than iron, steel, or a manufactured product, all manufacturing processes for the material occurred in the United States.</ins>

<ins>(5) "Public infrastructure project" means the construction, reconstruction, alteration, repair, maintenance, or improvement of any building, structure, or infrastructure by a procuring entity through a contract with another person. The term includes any:</ins>

<ins>(A) road, highway, or bridge;</ins>

<ins>(B) water, wastewater, or flood control facility;</ins>

<ins>(C) public building or facility;</ins>

<ins>(D) transit or rail facility, port, or airport; or</ins>

<ins>(E) broadband, telecommunications, or utility infrastructure.</ins>

<ins>(6) "State agency" has the meaning assigned by Section 2151.002.</ins>

<ins>Sec. 2252.232. DUTY TO REQUIRE PURCHASE OF CONSTRUCTION MATERIALS PRODUCED IN UNITED STATES. Except as provided by Section 2252.235, for each public infrastructure project of a procuring entity with an estimated contract value of $1 million or more, the procuring entity shall require the bid documents provided to all bidders and the resulting contract to include a provision requiring any construction materials used in the project to be produced in the United States.</ins>

<ins>Sec. 2252.233. POWER TO REQUIRE PURCHASE OF CONSTRUCTION MATERIALS PRODUCED IN UNITED STATES. For each public infrastructure project by a procuring entity with an estimated contract value of $1 million or less, the procuring entity may require the bid documents provided to all bidders and the resulting contract to include a provision requiring any construction materials used in the project to be produced in the United States.</ins>

<ins>Sec. 2252.234. PREFERENCE FOR CONSTRUCTION MATERIALS PRODUCED IN TEXAS. (a) A state agency that as a procuring entity includes a contract provision under Section 2252.232 or 2252.233 shall also include a contract provision requiring the contractor to purchase products and materials in the manner provided by Section 2155.444.</ins>

<ins>(b) A political subdivision that as a procuring entity includes a contract provision under Section 2252.232 or 2252.233 may also include the contract provision described by Subsection (a).</ins>

<ins>Sec. 2252.235. DETERMINATION FOR EXEMPTION BASED ON NONAVAILABILITY, DELAY, OR COST. (a) Section 2252.232 does not apply to a public infrastructure project of a procuring entity if the procuring entity determines in writing that:</ins>

<ins>(1) the construction materials needed for the public infrastructure project and produced in the United States are not:</ins>

<ins>(A) reasonably available in sufficient quantities; or</ins>

<ins>(B) of satisfactory quality; or</ins>

<ins>(2) compliance with Section 2252.232 would:</ins>

<ins>(A) materially delay the project schedule; or</ins>

<ins>(B) result in unreasonable cost increases.</ins>

<ins>(b) A determination under this section is not subject to public disclosure under Chapter 552. A procuring entity shall retain the reasoning for a determination under this section and provide the information to the comptroller for inclusion in the report required by Section 2252.239.</ins>

<ins>Sec. 2252.236. EXEMPTIONS FOR DISASTER-RELATED AND FEDERALLY FUNDED PURCHASES. This subchapter does not apply to a contract:</ins>

<ins>(1) entered into in response to a state of disaster declared under Chapter 418; or</ins>

<ins>(2) involving federal funds.</ins>

<ins>Sec. 2252.237. CONFLICT WITH OTHER STATE LAWS. To the extent of any conflict between this subchapter and another law of this state, including Subchapter G, the more stringent law controls.</ins>

<ins>Sec. 2252.238. RULES. The comptroller shall adopt rules to administer this subchapter, including rules for ensuring contractor compliance.</ins>

<ins>Sec. 2252.239. REPORT. (a) On or before September 1 of each year, the comptroller shall collect information from procuring entities on the purchase of construction materials under a public infrastructure project contract, including:</ins>

<ins>(1) the source of the purchases; and</ins>

<ins>(2) for a contract exempted from this subchapter under Section 2252.235, the reasoning supporting the exemption.</ins>

<ins>(b) On or before December 1 of each year, the comptroller shall submit a summary report of the information collected under Subsection (a) to the legislature.</ins>

### SECTION 2.

Not later than December 1, 2027, the comptroller shall adopt rules necessary to implement Subchapter H, Chapter 2252, Government Code, as added by this Act.

### SECTION 3.

Subchapter H, Chapter 2252, Government Code, as added by this Act, applies only in relation to a contract for which the request for bids or proposals or other applicable expression of interest is made public on or after the effective date of this Act.

### SECTION 4.

This Act takes effect September 1, 2027.