# HB 1261 - Introduced

By: Spencer H.B. No. 1261

A BILL TO BE ENTITLED

AN ACT

relating to the exercise of eminent domain for a demonstrated public necessity; limiting certain condemnation powers; requiring independent review, public hearings and county elections, enhanced compensation, repurchase rights, and revenue accounting; providing court review, injunctive relief, recovery of costs, and enforcement; contingent in part on a constitutional amendment.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

### SECTION 1.

SHORT TITLE. This Act may be cited as the Texas Private Property and Public Necessity Protection Act.

### SECTION 2.

LEGISLATIVE PURPOSE. The legislature finds that involuntary acquisition of private property is an extraordinary governmental act, that a public benefit is not by itself proof of an indispensable need for a particular parcel, and that the public and landowners require transparent findings, genuine alternatives, meaningful local participation, adequate compensation, and judicial review before property is taken.

### SECTION 3.

Chapter 2206, Government Code, is amended by adding Subchapter E to read as follows: SUBCHAPTER E. STATEWIDE PUBLIC NECESSITY STANDARDS

Sec. 2206.201. DEFINITIONS. In this subchapter:

(1) "Condemning authority" means any governmental or private person or entity asserting eminent-domain power under a general, local, or special law, including an agency, municipality, county, special district, water supply corporation, public utility, railway, common carrier, corporation created or controlled by a governmental entity, or agent acting on behalf of another entity.

(2) "Covered project" means the entire undertaking for which property acquisition by eminent domain is proposed, including related reservoirs, roads, pipelines, power facilities, transmission lines, mitigation areas, access facilities, storage, development phases, and improvements under common control or coordinated funding. A connected project may not be artificially divided to avoid a statutory requirement.

(3) "Public necessity" means an objectively demonstrated, immediate and critical need for essential public infrastructure or services directly benefiting the general public, including the local population where a taking occurs, that cannot reasonably be supplied by a feasible, less intrusive alternative. "Immediate" requires a presently established need and an objectively justified implementation schedule; speculative growth projections alone are insufficient. This definition does not limit a more protective standard in the Texas Constitution.

(4) "Feasible alternative" means a lawful, technically capable option reasonably implementable within an objectively justified period, including a combination of options, even if not the condemnor's least expensive or preferred option. Substantiated disproportionate cost and infeasibility may be considered; an avoidable or self-created deadline is not proof of necessity.

(5) "Protected land" means prime farmland identified under United States Department of Agriculture soil classifications, active timberland, watershed or recharge land, bottomland hardwood forest, a multigenerational ranch held continuously in family ownership for at least 25 years, or a homestead occupied or qualified for homestead treatment under applicable law. The claimant may supply reasonable records; absence of a tax exemption does not defeat otherwise qualifying land.

(6) "Affected owner" means a record title owner, including a cotenant group treated as one ownership unit for a particular parcel, whose land is sought through eminent domain for the covered project. Affiliates may not fabricate or consolidate owners to evade a threshold. A person owning multiple parcels is counted once for the separate-owner threshold.

(7) "Taking" includes acquiring fee title, easements, options secured by threatened condemnation, long-term exclusive occupancy, or another compensable property interest; the imposition of project-related restrictions may be examined under applicable takings law.

Sec. 2206.202. STATEWIDE APPLICATION; PREEMPTION OF STATE EXCEPTIONS. (a) This subchapter governs every proposed condemnation under state law by a public or private condemnor, regardless of size or location, and supplements Chapter 21, Property Code.

(b) Notwithstanding Section 2206.001(c), Section 2206.053(f) or (g), or a conflicting general, special, or local law, a permit, franchise, common-carrier designation, certificate of convenience, water plan, declaration of public use, funding award, or vote of an appointed board does not dispense with this subchapter.

(c) The subchapter applies to transportation, water, wastewater, drainage, ports, public buildings, schools, parks, utilities, transmission, pipelines, storage facilities, and other undertakings alike, but confers no new condemnation authority. No private contract, joint venture, subsidiary, proxy, affiliate, interlocal agreement, route change, condemnation threat, or staged acquisition may evade the requirements.

(d) A federal agency's exercise of independent federal eminent-domain authority is not regulated by this state Act. Its application to a federally certificated or preempted project is limited to the extent consistent with controlling federal law; a condemnor invoking preemption shall identify the specific federal authority in a verified public filing before asserting the exception. No broader exception is implied.

Sec. 2206.203. PROHIBITED PURPOSES AND NONDELEGATION. (a) A taking is prohibited if its primary purpose is speculative population or tax-base growth, private development, private commerce, increased private profit, assembly for resale, or a public-private venture principally supplying private economic return. A subsequent private lease or transfer is evidence to be considered, but the economic substance controls.

(b) An entity created to profit from acquiring condemned property, a private for-profit company, or an unelected governing board may not hold or exercise a new state-law delegation of eminent-domain power after the effective date. Only the state or an elected political-subdivision governing body may authorize a taking; an elected authorizing body must consider each affected project and issue written parcel-specific findings. A ministerial filing by staff does not replace its vote.

(c) An entity with a preexisting claim of private condemnation authority is subject to the transition provisions of this Act, applicable constitutional law, and the express limits in this section. This section shall be administered consistently with Section 2206.215 and the Constitutions of Texas and the United States.

Sec. 2206.204. BURDEN OF PROOF; NECESSITY; ALTERNATIVES. (a) Before filing a condemnation petition or threatening involuntary possession, a condemnor shall prove by clear and convincing evidence for each tract and each interest sought that (1) the project meets a present public necessity; (2) the exact parcel and interest are indispensable to that necessity; (3) no feasible combination of conservation, design changes, routes, sites, technology, existing property, demand reduction, voluntary acquisition, or a lesser estate can meet the demonstrated need; and (4) the taking is the least intrusive reasonably feasible means.

(b) The purpose must be defined without reference to the preferred site or sponsor. Greater population, forecast taxes, grants, economic development, or the convenience of the sponsor does not create a presumption. An offer refused by an owner is not evidence of public necessity.

(c) The assessment shall quantify actual local, downstream, and surrounding economic, agricultural, ecological, environmental, access, drainage, cultural, community, and cumulative effects. Project-specific mitigation shall be evaluated but cannot excuse a prohibited taking or replace the necessity proof.

(d) A landowner is not required to retain an expert or design an alternative. Unresolved material uncertainty or unsupported assumptions are insufficient to satisfy the condemnor's burden.

Sec. 2206.205. INDEPENDENT REVIEW PANEL. (a) Before the public hearing required by Section 2206.206, the condemnor shall submit the complete project and parcel-specific necessity record to an independent three-member review panel appointed by the district court in the county where the property lies from an approved public roster of qualified independent professionals.

(b) One member must possess relevant engineering or infrastructure expertise; one must possess land valuation, agricultural, or environmental expertise appropriate to the affected property; and one must be an attorney experienced in property or administrative law or a qualified neutral with judicial experience. No member may have represented or received project-related compensation from the condemnor, its affiliates, or the acquiring beneficiary during the preceding five years.

(c) The panel shall review alternatives, demand and supply assumptions, local benefits, impacts, and the proposed acquisition. It shall conduct a publicly noticed evidentiary meeting, accept written and oral objections, and publish an independently reasoned recommendation with its data and dissenting conclusions, if any, within 90 days of a complete submission.

(d) The panel's recommendation is evidence but is not conclusive, creates no presumption, and does not replace judicial findings. The condemnor pays reasonable approved costs into a court-administered fund; affected owners pay no panel costs. The court may replace a conflicted member and may order supplementation of an inadequate record.

Sec. 2206.206. FULL DISCLOSURE; PUBLIC HEARINGS. (a) At least 90 days before filing a condemnation petition, the condemnor shall provide each affected owner, county commissioners court, and affected municipality a complete project description, each route or site alternative, demand evidence, land map and ownership list, independent-review report, environmental and economic impact assessments, parcel-specific necessity findings, survey limits, acquisition instrument, and written notice of rights.

(b) The documents shall be available without charge online and in a physical public location in each affected county. Notice shall be mailed to affected owners; published in an appropriate newspaper; and posted publicly at least 30 days before a recorded hearing in each affected county. The hearing must allow reasonable oral and written comment and address material objections in a written response before a vote.

(c) A confidentiality agreement, trade-secret designation, contract with an intermediary, or nondisclosure clause may not conceal information material to condemnation necessity from an owner or court. Information lawfully protected from the general public may be examined under a judicial protective order; it may not be relied on to establish necessity if withheld from the affected owner and judge.

Sec. 2206.207. COUNTYWIDE REFERENDUM. (a) Before a condemnor files the first petition for a covered project that proposes, in aggregate, to acquire through eminent domain more than 100 acres or property of more than 10 separate owners, the project must receive an affirmative majority vote at a project-specific election in each county in which a project taking would occur.

(b) An affirmative vote is required in every affected county; approval in another county cannot substitute. A county commissioners court shall order the election when it receives a complete, verified application and a deposit of the reasonable election costs from the condemnor. An elected statewide entity is subject to the same county elections for projects under state authority.

(c) The proposition shall identify the project, maximum condemned acreage, general route or footprint, necessity claimed, beneficiaries, and maximum proposed interest to be taken, and shall ask whether the project may use eminent domain in that county. It may not package unrelated projects. Material expansion requires a new vote.

(d) Elections shall be administered under the Election Code, including Chapter 41 and applicable notice and canvassing laws. An election may not be held until after the independent panel report and county hearing. The condemnor shall bear documented election costs. Failure to hold an election is denial, not deemed approval.

(e) For determining thresholds, all reasonably foreseeable project phases, connected parcels, threatened condemnation acquisitions, common owners, affiliates, and substantially related routes or sites must be aggregated. An initial voluntary purchase that does not involve threatened condemnation is not itself condemned acreage, but a sham acquisition to evade this section shall be counted.

Sec. 2206.208. PROTECTED AGRICULTURAL AND NATURAL LANDS. (a) Land meeting Section 2206.201(5) may be condemned only on a showing by clear and convincing evidence of unavoidable immediate public necessity for that protected tract, as independently reviewed and judicially determined, and only after at least two-thirds of votes cast on the question by the qualified voters in each county containing affected protected land are in favor.

(b) This special election is required regardless of project acreage or number of affected owners. When both Sections 2206.207 and 2206.208 apply, one ballot may be used only if it clearly states the heightened two-thirds threshold. No approval in one county overrules a no vote in another.

(c) A project sponsor must evaluate farmland, timberland, homestead, and watershed avoidance and demonstrate why an alternative route or site outside protected lands is infeasible. Future mitigation or payments to unrelated parties do not satisfy the prohibition.

Sec. 2206.209. PRIOR JUDICIAL HEARING; NO EARLY POSSESSION. (a) The district court where the tract is located has original jurisdiction, before appointment of special commissioners under Chapter 21, Property Code, to decide lawful authority, public necessity, independent panel compliance, elections, protected status, the validity of a proposed interest, and the absence of feasible alternatives.

(b) The condemnor must produce all evidence and establish each element by clear and convincing evidence. The court shall conduct an evidentiary hearing with reasonable discovery and opportunity for the owner to examine witnesses, make independent findings as to each parcel, and deny or dismiss a proceeding that fails the burden.

(c) Neither a permit nor a condemnor's own determination receives deference. No court or special commissioner may permit possession, entry for construction, site disturbance, or transfer of ownership pending a final favorable necessity determination and completion of timely review. Lawful preliminary surveys remain governed by existing law and do not authorize intrusive construction or a permanent property right.

(d) Either party may take an interlocutory appeal from the necessity ruling. The filing of a timely appeal stays all condemnation and possession activity for the affected parcel through resolution of that appeal. A deposit, bond, emergency declaration, or commissioners' award does not waive the stay.

(e) An owner who obtains dismissal or an injunction for noncompliance, or whose condemnor voluntarily dismisses after a substantial contest to necessity, shall receive reasonable attorney, expert, appraisal, and court costs. An unsuccessful owner shall not owe the condemnor's professional fees solely for raising a good-faith challenge.

Sec. 2206.210. COMPENSATION; DAMAGES AND COSTS. (a) The minimum amount for a taking permitted by this subchapter is 200 percent of the fair market value of the interest condemned as of the valuation date immediately preceding any project-caused diminution, plus independently established severance damages to the remainder and reasonable actual relocation, loss-of-access mitigation, restoration, fencing, drainage, business-interruption, moving, and necessary appraisal, legal, and professional expenses caused by the taking.

(b) The 200 percent value floor applies separately to the interest taken. Additional categories may not be used to reduce that floor, and an item of actual loss may be recovered only once. This section provides an enhancement beyond ordinary constitutional compensation and does not reduce another remedy or federal minimum.

(c) The condemnor shall pay or secure the required amount before possession. If any owner contests valuation, the undisputed amount shall be tendered, but tender alone does not authorize possession while necessity remains in litigation. The court shall authorize independently obtained appraisals and allow evidence of long-term agricultural and timber use insofar as relevant under the appraisal law.

(d) For an easement, the acquired interest must be narrowly described by area, duration, permissible uses, access, future expansion, restoration duty, and termination; a condemnor may not treat a limited corridor award as blanket authority for unrelated future facilities.

Sec. 2206.211. 10-YEAR RETURN; NO SHAM PROGRESS. (a) In addition to all rights under Subchapter E, Chapter 21, Property Code, a former owner or the owner's heirs, successors, or assigns has an enforceable right to repurchase an interest condemned under this subchapter if the property is not actually placed into the original specifically stated public-necessity use within 10 years after acquisition, even if surveying, planning, procurement, financing, permitting, or another preliminary act occurred.

(b) The right also arises earlier upon cancellation, abandonment, disposal, or change to a substantially different use. A redevelopment label, partial nonproductive use, transfer to an affiliate, or lease may not constitute use unless the condemned parcel is materially serving the authorized public necessity.

(c) The condemnor shall notify the former owner and known heirs promptly upon an event in Subsection (b) and not later than 30 days after the 10-year deadline. The person has at least 180 days after actual notice to accept an offer of repurchase, and 180 days after acceptance to close. Failure to deliver notice does not extinguish the right.

(d) The repurchase price is the original compensation attributable to the interest reacquired, adjusted by the change in the United States Consumer Price Index for All Urban Consumers from acquisition through repurchase; the amount may not be increased for improvements installed solely for an abandoned purpose. The seller shall convey the same estate or interest reasonably capable of reconveyance, free of liens created by the condemnor.

(e) The district court may compel conveyance, rescind an unlawful transfer, and award costs and reasonable fees to a prevailing former owner. The stronger of this section and otherwise applicable repurchase law governs a new covered acquisition. Existing lawful repurchase rights are not diminished.

Sec. 2206.212. DIRECT PROPERTY REVENUE RETURN. (a) If receipts or revenue are obtained directly from property involuntarily acquired for a covered project, including leases, license fees, royalties, rents, sales, commercial access charges, concessions, or consideration for later transfer or commercial use, the condemnor shall annually account for and remit the attributable revenue in proportion to the real property interests acquired from the affected former owners and successors.

(b) Revenue from a specific parcel must first be attributed to that parcel. Revenue inseparable among several condemned parcels shall be allocated using independently appraised contribution to the revenue-generating use, or acreage if contribution cannot reasonably be distinguished. No contractual affiliate, successor, governmental corporation, or project sponsor may evade payment through internal transfers or noncash consideration.

(c) Public taxes and general utility tariffs collected for services that cannot reasonably be attributed to the affected parcel are not deemed property-generated receipts merely because a public facility crosses the parcel. This narrow identification rule does not exempt site-specific commercial revenue and shall be reviewed by legislative counsel for conformity with the proposed constitutional amendment and adopted legislative priority.

(d) The condemnor shall maintain an audited annual property-revenue ledger and send statements and distributions to known former owners. An affected owner may audit the records, seek an accounting and injunction, and recover wrongfully withheld amounts, interest, and reasonable fees. A compensation award under Section 2206.210 may not be used as an offset to revenue due under this section.

Sec. 2206.213. TRANSPARENCY; OVERSIGHT; ENFORCEMENT. (a) The comptroller shall maintain a free statewide registry of covered projects and the condemning authority; requested parcels and acreage; number of owners; purpose and underlying legal authority; assessments and alternatives; panel reports; elections; court rulings; use-commencement dates; disposition, repurchase, and revenue remittances; and compliance and enforcement actions.

(b) The attorney general may seek injunctive or declaratory relief to prevent an unauthorized taking. An affected owner may bring an action for declaratory or injunctive relief and enforcement of a mandatory duty in a district court of the county where the land lies. Jurisdiction and a limited waiver of governmental and sovereign immunity to suit and liability are provided to the extent necessary for the prospective relief and specific fee and repurchase remedies expressly conferred by this subchapter; this subsection creates no general tort damages remedy.

(c) Materially false verification, evasion by project segmentation, concealment of beneficial ownership, or retaliation for participation disqualifies the defective application until corrected and is subject to court-ordered injunctive relief. Additional criminal or civil penalties require independent Legislative Council review before inclusion.

Sec. 2206.214. NARROW TEMPORARY LIFE-SAFETY RELIEF. A district court may authorize only temporary, reasonably necessary access or a nonpermanent property interest for a documented imminent threat to human life when no feasible response exists without immediate access. The order must specify maximum duration, safeguards, payment, restoration, and a hearing within 10 days. It does not authorize a permanent taking, ordinary growth project, speculative capacity expansion, or evasion of the necessity requirement.

Sec. 2206.215. PROTECTED RIGHTS; FEDERAL LAW. (a) This subchapter applies prospectively to petitions filed on or after its effective date, subject to the constitutional protection of final judgments, interests already acquired, and legally protected contracts. A pending route designation, project plan, preliminary expenditure, or unfiled proposal alone is not a vested condemnation of a particular parcel.

(b) This subchapter does not authorize the state to regulate direct federal condemnation or diminish rights under the Constitution of the United States. Any federally preempted application is severed only to the minimum degree required by controlling law; the remaining state-law duties continue where lawful.

Sec. 2206.216. RULES; NO WAIVER. The comptroller, the attorney general, the Texas Department of Transportation, the Public Utility Commission, the Railroad Commission, and the Texas Commission on Environmental Quality may coordinate published implementation guidance within their lawful jurisdictions, but may not create exceptions or substitute implied approval for a statutory or constitutional protection.

### SECTION 4.

Section 2206.001, Government Code, is amended by adding Subsection (f) to read as follows:

(f) An exception recognized in Subsection (c) preserves only the underlying authority otherwise granted by law; it does not exempt a condemnor from the public necessity, election, independent review, compensation, and other requirements of Subchapter E, subject to controlling federal law.

### SECTION 5.

Section 2206.053, Government Code, is amended by adding Subsection (h) to read as follows:

(h) Notwithstanding Subsection (f) or (g), an ordinance, resolution, or delegation that does not identify a parcel or that authorizes condemnation without compliance with Subchapter E may not substitute for the parcel-specific public necessity findings, independent review, or county election required by that subchapter.

### SECTION 6.

Chapter 21, Property Code, is amended by adding Section 21.0125 to read as follows:

Sec. 21.0125. PRIOR PUBLIC NECESSITY DETERMINATION. (a) Notwithstanding Sections 21.001, 21.011, 21.014, and 21.021, before special commissioners are appointed or possession granted, the district court in the county containing the property shall make the findings required by Subchapter E, Chapter 2206, Government Code, when applicable.

(b) No compensation award, deposit, temporary injunction bond, or waiver of commissioners' objections dispenses with the prior judicial determination and any timely interlocutory appeal. This section supplements Section 21.003.

### SECTION 7.

Chapter 21, Property Code, is amended by adding Section 21.0431 to read as follows:

Sec. 21.0431. MINIMUM COMPENSATION FOR CERTAIN TAKINGS. For a taking covered by Subchapter E, Chapter 2206, Government Code, special commissioners and courts shall award no less than the compensation required by Section 2206.210 of that code. A written settlement made with independently represented owners may establish different payment terms only if it does not purport to waive any required constitutional minimum or entitlement of another owner.

### SECTION 8.

Section 21.101, Property Code, is amended by adding Subsection (d) to read as follows:

(d) For property acquired under Subchapter E, Chapter 2206, Government Code, the additional triggers, ten-year actual-use test, notice protections, and remedies in Section 2206.211, Government Code, apply in addition to this subchapter; an existing stronger repurchase right is preserved.

### SECTION 9.

Section 21.103, Property Code, is amended by adding Subsection (c) to read as follows:

(c) The repurchase price for a property interest acquired under Subchapter E, Chapter 2206, Government Code, is governed by Section 2206.211, Government Code, rather than the unadjusted resale price in Subsection (b), without limiting another repurchase entitlement available for acquisitions not covered by that subchapter.

### SECTION 10.

CONFORMING EFFECT ON OTHER CODES. The requirements of Subchapter E, Chapter 2206, Government Code, and Section 21.0125, Property Code, apply notwithstanding a conflicting condemnation grant or procedure in Transportation Code Chapter 203; Utilities Code Chapter 181 or 186; Water Code Chapter 49; Natural Resources Code Chapter 111; Local Government Code Chapter 251; Education Code Section 11.155; or a special enabling law, subject to the supremacy of controlling federal law. An authorizing law that conflicts with this Act shall be read together with this Act to give effect to the stronger lawful protection against an involuntary taking.

### SECTION 11.

IMPLEMENTATION; LEGISLATIVE REVIEW. (a) Within 180 days after this Act takes effect, the comptroller shall publish a consolidated list of existing state-law entities claiming condemnation authority and the statutes that confer it, flag private or unelected bodies, and submit to the legislature proposed conforming repeals or limitations.

(b) No new prohibited taking may proceed solely because implementing rules have not yet been adopted. This Act does not appropriate funds. The fiscal effect of panels, elections, enhanced compensation, reporting, and revenue remittance must be addressed through the legislative appropriations process.

### SECTION 12.

TRANSITION. This Act governs condemnation petitions filed, and new acquisitions by express threat of condemnation initiated, on or after the effective date. It does not reopen final judgments or undo an interest actually and lawfully acquired before that date. A preexisting permit, certificate, plan, or contract does not by itself grandfather a future unfiled condemnation proceeding. Any application to a legally protected preexisting right shall be resolved under the Texas and United States Constitutions.

### SECTION 13.

SEVERABILITY. If a provision or application of this Act is held invalid, remaining provisions capable of independent application remain effective. A finding invalidating a referendum procedure, reimbursement formula, or delegation limit does not by itself authorize a taking prohibited by another effective provision.

### SECTION 14.

EFFECTIVE DATE AND CONTINGENCY. This Act takes effect January 1, 2028, but only if the constitutional amendment proposed by the 90th Legislature, Regular Session, 2027, concerning the public-necessity standard for eminent domain is approved by the voters at the November 2, 2027 election. If that amendment is not approved, this Act has no effect.