Water Code § 36.1015: RULES FOR PERMITS IN BRACKISH GROUNDWATER PRODUCTION ZONES
No bill in the 90th Legislature changes this section yet
Follow this section in Texas Bill Atlas: a bill filed later that changes it shows up as new.
Part of Water Code Chapter 36, with every bill that changes it.
Bills are matched to sections automatically from their text and can be missed, for example when a bill changes a whole chapter at once or renumbers sections. No bill listed here does not mean no bill changes this section.
Current law
Sec. 36.1015. RULES FOR PERMITS IN BRACKISH GROUNDWATER PRODUCTION ZONES. (a) In this section:
(1) "Designated brackish groundwater production zone" means an aquifer, subdivision of an aquifer, or geologic stratum designated under Section 16.060(b)(5).
(2) "Development board" means the Texas Water Development Board.
(3) "Gulf Coast Aquifer" means the system of hydrogeologic units that run along the Gulf Coast from the Sabine River to the Rio Grande, including:
(A) the Catahoula confining system, including the Frio Formation, the Anahuac Formation, and the Catahoula Tuff or Sandstone;
(B) the Jasper Aquifer, including the Oakville Sandstone and Fleming Formation;
(C) the Burkeville confining system separating the Jasper Aquifer from the Evangeline Aquifer;
(D) the Evangeline Aquifer, including the Goliad Sand; and
(E) the Chicot Aquifer, including the Willis Sand, the Bentley Formation, the Montgomery Formation, the Beaumont Clay, and alluvial deposits at the surface.
(b) The requirements of this section do not apply to a district that:
(1) overlies the Dockum Aquifer; and
(2) includes wholly or partly 10 or more counties.
(c) A district located over any part of a designated brackish groundwater production zone may adopt rules to govern the issuance of permits under this section for the completion and operation of a well for the withdrawal of brackish groundwater from a designated brackish groundwater production zone and shall adopt rules described by this subsection if the district receives a petition from a person with a legally defined interest in groundwater in the district. The district must adopt the rules not later than the 180th day after the date the district receives the petition. Rules adopted under this subsection apply only to a permit for a project described by Subsection (d).
(d) A person may obtain a permit under rules adopted under this section for projects including:
(1) a municipal project designed to treat brackish groundwater to drinking water standards for the purpose of providing a public source of drinking water; and
(2) an electric generation project to treat brackish groundwater to water quality standards sufficient for the project needs.
(e) The rules adopted under this section must:
(1) provide for processing an application for a brackish groundwater production zone operating permit in the same manner as an application for an operating permit for a fresh groundwater well, except as provided by this section;
(2) allow withdrawals and rates of withdrawal of brackish groundwater from a designated brackish groundwater production zone not to exceed and consistent with the withdrawal amounts identified in Section 16.060(e);
(3) provide for a minimum term of 30 years for a permit issued for a well that produces brackish groundwater from a designated brackish groundwater production zone;
(4) require implementation of a monitoring system recommended by the development board to monitor water levels and water q
The section continues: whole chapter.
Links
- This chapter as it stands now, Markdown copy of the Texas Legislative Council's statute files
- Official text on statutes.capitol.texas.gov
Texas Bill Atlas is an independent research tool, not an official state website.