Utilities Code § 121.213: INSTALLATION, REMOVAL, AND REPLACEMENT OF CERTAIN PIPELINES
No bill in the 90th Legislature changes this section yet
Follow this section in Texas Bill Atlas: a bill filed later that changes it shows up as new.
Part of Utilities Code Chapter 121, with every bill that changes it.
Bills are matched to sections automatically from their text and can be missed, for example when a bill changes a whole chapter at once or renumbers sections. No bill listed here does not mean no bill changes this section.
Current law
Sec. 121.213. INSTALLATION, REMOVAL, AND REPLACEMENT OF CERTAIN PIPELINES. (a) In this section, "distribution gas pipeline facility" means a pipeline facility that distributes gas directly to end-use customers.
(b) A distribution gas pipeline facility operator may not install as part of the operator's underground system a cast iron, wrought iron, or bare steel pipeline.
(c) The railroad commission by rule shall require the operator of a distribution gas pipeline facility system to:
(1) develop and implement a risk-based program for the removal or replacement of underground distribution gas pipeline facilities; and
(2) annually remove or replace at least eight percent of underground distribution gas pipeline facilities posing the greatest risk in the system and identified for replacement under the program.
Added by Acts 2019, 86th Leg., R.S., Ch. 363 (H.B. 866), Sec. 2, eff. June 2, 2019.
Amended by:
Acts 2025, 89th Leg., R.S., Ch. 1167 (H.B. 4042), Sec. 2, eff. September 1, 2025.
Links
- This chapter as it stands now, Markdown copy of the Texas Legislative Council's statute files
- Official text on statutes.capitol.texas.gov
- RSS feed of actions on these bills
Texas Bill Atlas is an independent research tool, not an official state website.