Tax Code § 202.054: QUALIFICATION OF OIL FROM NEW OR EXPANDED ENHANCED RECOVERY PROJECT FOR SPECIAL TAX RATE
No bill in the 90th Legislature changes this section yet
Follow this section in Texas Bill Atlas: a bill filed later that changes it shows up as new.
Part of Tax Code Chapter 202, with every bill that changes it.
Bills are matched to sections automatically from their text and can be missed, for example when a bill changes a whole chapter at once or renumbers sections. No bill listed here does not mean no bill changes this section.
Current law
Sec. 202.054. QUALIFICATION OF OIL FROM NEW OR EXPANDED ENHANCED RECOVERY PROJECT FOR SPECIAL TAX RATE. (a) In this section:
(1) "Active operation" means the start and continuation of a fluid injection program for a secondary or tertiary recovery project to enhance the displacement process in the reservoir.
(2) "Commission" means the Railroad Commission of Texas.
(3) "Enhanced recovery project" means the use of any process for the displacement of oil from the earth other than primary recovery and includes the use of an immiscible, miscible, chemical, thermal, or biological process and any co-production project.
(4) "Existing enhanced recovery project" means an enhanced recovery project that began active operations before September 1, 1989.
(5) "Expanded enhanced recovery project" or "expansion" means the addition of injection and producing wells, the change of injection pattern, or other operating changes to an existing enhanced oil recovery project that will result in the recovery of oil that would not otherwise be recovered.
(6) "Incremental production" means the volume of oil produced by an expanded enhanced recovery project in excess of the production decline rate established under conditions before expansion for an existing enhanced recovery project.
(7) "Operator" means the person responsible for the actual physical operation of an enhanced recovery project.
(8) "Positive production response" means that the rate of oil production from the wells affected by an enhanced recovery project is greater than the rate that would have occurred without the project.
(9) "Primary recovery" means the displacement of oil from the earth into the well bore by means of the natural pressure of the oil reservoir, including artificial lift.
(10) "Production decline rate" means the projected future oil production from a project area as extrapolated by a method approved by the commission.
(11) "Recovered oil tax rate" means the tax rate provided by Section 202.052(b) of this code.
(12) "Secondary recovery project" means an enhanced recovery project that is not a tertiary recovery project.
(13) "Tertiary recovery project" means an enhanced recovery project using a tertiary recovery method listed in the federal June 1979 energy regulations referred to in Section 4993, Internal Revenue Code of 1986, or approved by the United States secretary of the treasury for purposes of administering Section 4993, Internal Revenue Code of 1986, without regard to whether that section remains in effect.
(14) "Co-production project" means an enhanced recovery project in which water is permanently removed from an oil and/or gas reservoir in an effort to lower the gas-water or oil-water contact in the reservoir or to reduce reservoir pressure to recover entrained hydrocarbons from the reservoir that would not be produced by conventional primary or secondary production methods.
(15) "Commission approved co-production project" means a reservoir development project in whic
The section continues: whole chapter.
Links
- This chapter as it stands now, Markdown copy of the Texas Legislative Council's statute files
- Official text on statutes.capitol.texas.gov
Texas Bill Atlas is an independent research tool, not an official state website.