Natural Resources Code § 134.056: SMALL MINE EXEMPTION
No bill in the 90th Legislature changes this section yet
Follow this section in Texas Bill Atlas: a bill filed later that changes it shows up as new.
Part of Natural Resources Code Chapter 134, with every bill that changes it.
Bills are matched to sections automatically from their text and can be missed, for example when a bill changes a whole chapter at once or renumbers sections. No bill listed here does not mean no bill changes this section.
Current law
Sec. 134.056. SMALL MINE EXEMPTION. The commission shall designate a qualified public or private laboratory to prepare the determination of probable hydrologic consequences and statement of the results of test borings or core samplings required by Section 134.052 and shall pay the costs of preparing the determination and statement if:
(1) a surface coal mining operator makes a request in writing; and
(2) the commission finds that the probable total annual production at all locations of the surface coal mining operator will not exceed 300,000 tons.
Added by Acts 1995, 74th Leg., ch. 76, Sec. 12.02(a), eff. Sept. 1, 1995. Amended by Acts 1997, 75th Leg., ch. 1307, Sec. 1, eff. Sept. 1, 1997.
Links
- This chapter as it stands now, Markdown copy of the Texas Legislative Council's statute files
- Official text on statutes.capitol.texas.gov
Texas Bill Atlas is an independent research tool, not an official state website.